{"id":4397,"date":"2013-10-15T13:06:45","date_gmt":"2013-10-15T11:06:45","guid":{"rendered":"http:\/\/misturasdev.des2.net\/?p=4397"},"modified":"2017-04-20T09:03:19","modified_gmt":"2017-04-20T07:03:19","slug":"nunez-feijoo-inaugura-la-piscina-municipal-de-moana","status":"publish","type":"post","link":"https:\/\/misturas.es\/en\/sin-categoria\/nunez-feijoo-inaugura-la-piscina-municipal-de-moana\/","title":{"rendered":"Moa\u00f1a has the main municipal swimming pool in O Morrazo since 2009"},"content":{"rendered":"<p>Misturas built the complex with a gym on the ground floor. The indoor and heated swimming pool of Moa\u00f1a is one of the most remarkable equipments built by Misturas. The building, with 2.202 m2 distributed between distributed over ground floor and first floor, has a 12,5 x 25,02 metres pool, a 275m2 an equipped area for gym, and all the required services for this kind of facilities. The building was inaugurated by Alberto N\u00fa\u00f1ez Feijoo, president of the Xunta de Galicia, in late October 2009, and it became O Morrazo&#8217;s municipal swimming pool of reference since then. <\/p>\n<div class=\"flexslider\"><img decoding=\"async\" class=\"play_slide\" src=\"https:\/\/misturas.es\/wp-content\/themes\/inkthemetrust\/images\/play.png\" \/><\/p>\n<ul class=\"slides\">\n<li><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2001\" alt=\"091029702 Piscina Moa\u00f1a\" src=\"https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091029702-Piscina-Moa\u00f1a-623x1024.jpg\" width=\"623\" height=\"1024\" srcset=\"https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091029702-Piscina-Moa\u00f1a-623x1024.jpg 623w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091029702-Piscina-Moa\u00f1a-182x300.jpg 182w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091029702-Piscina-Moa\u00f1a-220x361.jpg 220w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091029702-Piscina-Moa\u00f1a.jpg 812w\" sizes=\"auto, (max-width: 623px) 100vw, 623px\" \/><\/li>\n<li><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2002\" alt=\"091112100 Piscina Moa\u00f1a\" src=\"https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112100-Piscina-Moa\u00f1a-1024x455.jpg\" width=\"1024\" height=\"455\" srcset=\"https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112100-Piscina-Moa\u00f1a-1024x455.jpg 1024w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112100-Piscina-Moa\u00f1a-300x133.jpg 300w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112100-Piscina-Moa\u00f1a-220x97.jpg 220w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112100-Piscina-Moa\u00f1a.jpg 1429w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/li>\n<li><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2003\" alt=\"091112153 Piscina Moa\u00f1a\" src=\"https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112153-Piscina-Moa\u00f1a-1024x563.jpg\" width=\"1024\" height=\"563\" srcset=\"https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112153-Piscina-Moa\u00f1a-1024x563.jpg 1024w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112153-Piscina-Moa\u00f1a-300x165.jpg 300w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112153-Piscina-Moa\u00f1a-220x121.jpg 220w, https:\/\/misturas.es\/wp-content\/uploads\/2013\/05\/091112153-Piscina-Moa\u00f1a.jpg 1355w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/li>\n<\/ul>\n<\/div>\n<p> During the construction, it was used a mixed ,  roof: in the zone of the pool, steel screens; in the main corridor, inverted roof with isolation and aggregate protection, and asphaltic sheet in the access area. The central body of the building was differenciated using prefabricated concrete panels; in the rest of the building, lightened fa\u00e7ades of double leaf were built. Finally, aluminium carpentry  for time buy at my nice. I of temptation to  was used, -anodized outside the building-, and floors of terrazzo, smoothen concrete, stoneware and granite, according to the zones of the building, as well as a complete and modern network of adapted services for this kind of installations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Misturas built the complex with a gym on the ground floor. The indoor and heated swimming pool of Moa\u00f1a is one of the most remarkable equipments built by Misturas. The building, with 2.202 m2 distributed between distributed over ground floor and first floor, has a 12,5 x 25,02 metres pool, a 275m2 an equipped area [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1706,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[87],"tags":[],"class_list":["post-4397","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"_links":{"self":[{"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/posts\/4397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/comments?post=4397"}],"version-history":[{"count":0,"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/posts\/4397\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/media\/1706"}],"wp:attachment":[{"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/media?parent=4397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/categories?post=4397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/misturas.es\/en\/wp-json\/wp\/v2\/tags?post=4397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}